Gemstone pendant - personalised/birthstone

£62.00

This necklace can be personalised with gemstones of your choice.

It’s made of sterling silver and can come with 1,2 or 3 gemstones. This is a 2.5cm diameter round silver pendant presented on an 18inch chain.

This is made by myself using sterling silver and tube set faceted gem stones in 3 or 4mm.

This stones included are primarily cubic zirconia, there is usually an option to upgrade/change the stones if you prefer. Please message me if you would prefer different stones and I can discuss the prices with you. Stones below are the gems available at the time but stocks can vary, I will tell you if there are any changes.

January - Red “Garnet”

February - Purple “Amethyst”

March - Light blue “Aquamarine”

April - Clear “Diamond”

May - Dark green “Emerald”

June - Peach “Moonstone”

July - Red - “Ruby”

August - Light green “Peridot”

September - Dark blue “Sapphire”

October - Pink “Tourmaline”

November - Yellow “Citrine”

December - Light blue “Turquoise”

After purchasing item, please email me at kate@insightlight.co.uk to confirm stones wanted (unless an upgrade is required, then please message before purchase, as price may vary).

Price stated includes postage and a presentation box.

This necklace can be personalised with gemstones of your choice.

It’s made of sterling silver and can come with 1,2 or 3 gemstones. This is a 2.5cm diameter round silver pendant presented on an 18inch chain.

This is made by myself using sterling silver and tube set faceted gem stones in 3 or 4mm.

This stones included are primarily cubic zirconia, there is usually an option to upgrade/change the stones if you prefer. Please message me if you would prefer different stones and I can discuss the prices with you. Stones below are the gems available at the time but stocks can vary, I will tell you if there are any changes.

January - Red “Garnet”

February - Purple “Amethyst”

March - Light blue “Aquamarine”

April - Clear “Diamond”

May - Dark green “Emerald”

June - Peach “Moonstone”

July - Red - “Ruby”

August - Light green “Peridot”

September - Dark blue “Sapphire”

October - Pink “Tourmaline”

November - Yellow “Citrine”

December - Light blue “Turquoise”

After purchasing item, please email me at kate@insightlight.co.uk to confirm stones wanted (unless an upgrade is required, then please message before purchase, as price may vary).

Price stated includes postage and a presentation box.